← All articles

Quality checks that matter before slab and handover

Quality is not a single inspection—it is a rhythm. Before slab pours, verify reinforcement spacing, cover blocks, and conduit routing. After waterproofing, insist on flood tests in wet areas.

At handover, run a snag list with your project manager: paint uniformity, door alignments, and drainage slopes are common items that are cheaper to fix before you move in.

Construction quality checks | YourBuilder | YourBuilder